National Highway Division,Jharsuguda

The National Highway Division Jharsuguda created in the year 1999 has got a jurisdiction of 156/436km length of National Highway 200, which starts from Kanaktora in Jharsuguda district bordering Chatisgarh State and ends at Tileibani at 156/436 km touching  NH -6 . National Highway No 200 has become a very important National Highway in the state of Orissa in view of the current rapid Industrialization. It passes through major cities of Chhatisgarh State such as Raipur, Bilashpur & Raigarh and of Orissa State such as Jharsuguda, Kuchinda, Deogarh, Kaniha, Kamakshanagar & Chandikhol. It connects NH 6  at Raipur  & NH -5 at chandikhol after touching NH -6 once again at 156/436 km.at Tileibani.  Out of this 156/436 km, 105 km length passes through Jharsuguda  district 38 km length passes through Kuchinda sub-Division of Sambalpur District and rest 13.436 km passes through Deogarh District.

 

Districtwise Details of lane position of NH 200 from 0/0 km to 156/436 km is given below in tabular form.

Name of the

District.

Single lane.

Intermediate lane.

Double lane.

Chainage

In km

Length

in km

Chainage

Length

in km

Chainage

Length

in km

 

 

Jharsuguda

.

1/0 to 6/0

5.0

0/0 to 1/0

1.0

6/0-10/0

4.0

14/0 to 16/0

2.0

10/0 to 14/0

4.0

21/0-30/0

9.0

89/0 to 89/638

0.638

16/0 to 21/0

5.0

36/0-41/430

5.430

91/0 to100/600

9.600

30/0 to 36/0

6.0

67/850-71/200

3.350

101/0  to105/0

4.0

41/430 to67/850

26.420

72/0-89/0

17.0

 

 

71/200 to 72/0

0.800

 

 

89/638 to 91/0

1.362

100/600 to101/0

0.400

 

 

 

Sambalpur

 

105/0 to 106/0

 

1.0

 

106/0 to 106/700

 

0.700

 

123/0 to 131/0

8.0

106/700 to 109/400

2.7

109/400 to 109/900

0.5

 

 

109/900 to 115/0

5.10

115/0-119/800

4.800

119/800 to 120/500

 

0.700

120/500-123/0

2.500

133/0 to 138/0

5.0

131/0-133/0

2

140/600-141/0

0.400

138/0-140/600

2.600

 

 

141/0-143/0

2

Deogarh

143/0 to155/0

12

155/0-156/436

1.436

 

 

Total

 

48.138 km

 

61.518km

 

46.780km

 

Traffic census Data collected by the Ministry of Surface Transport & Highway (MOSRT&H) conducted during Nov. 2006  Kanaktura & Tileibani is given below.

 

Sl .

No.

Count Station

PCU

(Passenger car unit)

CVD

(Commercial vehicle density)

Count Station

No.

Name.

1

ORS-39

Kuraimal

2193

390

2

ORS-40

Gandhi-Chowk

13352

2479

3

ORS-41

Kolabira

3108

443

4

ORS-42

Kuchinda

3686

514

 

            To meet the required standard of better infrastructure for the rapidly growing industrialization in and around Jharsuguda district widening of this entire stretch under the jurisdiction of Jharsuguda N.H. Division to two lane standard along with construction of several minor & major bridges is highly essential .

 

Widening from single/intermediate Lane to two lane completed since creation of Division in 1999.

Sl

No.

Widening work done since creation of the Division.

Total

Length

Amount

Spent.(in lakh)

 

Year of

Completion.

1.

72/0km to 89/0 km

17 km

355.77

2005

2.

123/0 km  to 131/0km

8 km

344.42

2006

3.

21/0 km to 30/0 km

9 km

489.62

2007

 

Total:-

34 km

1189.81

 

 

Details of ongoing projects

 

Sl

No.

Name of the work.

Sanctioned

Cost.

(Rs. In lakh)

Expenditure

Upto 31.03.2008

(Rs. In lakh)

Physical

Progress (in km).

Target

Achievement

1.

N.H.Original work-

6/0km to10/0km&

36/0km to41/430km

957.40

725.09

9.431

7.00

2.

Special Repair  to IB bridge.such as providing mastic wearing coat etc.

56.99

47.88

Wearing coat & expansion joint work completed.

 

                                           

 

                                                  

           

Projects under Annual Plan 2008-09

 

 

SL

No.

Name of work.

Provision

in Annual plan.

Remarks.

1.

Widening to two lane standard with strengthening from 0/0km to 6/0 km & 14/0 km to 16/0 km.

10.00 Crore.

Estimate of 15.77 crore sent to Ministry for sanction.

2.

Widening to two lane standard with strengthening from 59/0 km to 68/0 km

13.00 Crore.

Detailed estimate under preparation.

3.

Periodic repair from  52/0 km to 59/0km

-

Detailed estimate is under preparation.

4.

Periodic repair from 104/0 km to 117/0km

-

Detailed estimate is under preparation.

5.

Periodic repair from 149/0 km to 156/436km

-

Detailed estimate is under preparation.

6.

Construction of High level bridge at Siriapali (79/376 km)

5.00 Crore.

Design & drawing under preparation.

7.

Construction of Minor bridge at 84th km

2.00 Crore.

Detailed estimate under preparation.

8.

Construction of ROB cum bypass at Belpahar.

5.00 Crore.

Alignment  finalised. Detail project report under preparation.Estimate for land acquisition & shifting of utilities under preparation.